The whole room, back to brick

Full Bathroom Renovations in the Post-War Belt

A full renovation is the only honest answer when the room is sixty years old, the grout has gone and the wall behind the shower sounds hollow when you tap it.

Completed full bathroom renovation in a brick-and-tile home

Licence and insurance details are provided on your discovery call, or whenever you ask. Request them →

What a full renovation actually includes

Back to the frame or the slab. The wall tiles, the bedding, the bath, the vanity, the toilet, the shower screen and in most cases the ceiling lining all come out. Plumbing and electrical are re-run, the floor is set to fall so water goes where it should, a new membrane goes down, then tiling, cabinetry and fit-off.

That sequence does not change from house to house. What changes is what the demolition uncovers, and in this part of Sydney the age of the housing makes that fairly predictable.

The three house types we work in

Brick or brick veneer, roughly 1950 to 1970

The bulk of the stock across Yagoona, Bass Hill, Chester Hill and Condell Park. Expect a steel bath with a shower over it, wall tiles to about chest height, a separate toilet next door, and fibre cement sheeting behind the tiles. The frames are usually hardwood and in good order unless the shower has been leaking.

Fibro and part-fibro, mostly the riverside pockets

More common around Panania, Picnic Point and parts of Milperra. Wall and ceiling sheeting is the thing to test here before anyone cuts. Floors are more often timber over a crawl space than slab, which makes moving a waste easier than it would be on a slab but means the floor structure needs checking for rot.

Brick veneer on slab, 1970s onward, plus duplex and secondary dwellings

Later infill and the newer duplex halves. Layouts are tighter, the floor is a slab, and the original waterproofing may be a painted membrane that has reached the end of its life. Less likely to hold asbestos, more likely to need a full re-set of the floor falls.

Combining the bathroom and the toilet

This is the change worth most in a post-war house, so it deserves its own paragraph. Two rooms of about 1.7 by 2.2 metres and 0.9 by 1.5 metres, each with its own door, become one room of a usable size. You gain enough width for a 1,200 millimetre vanity or a 900 shower with a proper screen, and you lose a door and a dead corridor.

The trade-off is obvious: one toilet instead of two rooms with one toilet. For a household of seven, that can be the wrong answer, and we will say so. The alternative is to leave the toilet alone, renovate the bathroom and put a second toilet somewhere else entirely — in which case look at the ensuite page instead.

Waterproofing, which is where jobs are won and lost

Nothing visible in a finished bathroom tells you whether the waterproofing was done properly. It is behind the tiles, it cannot be inspected later without destroying the room, and it is the most common reason a bathroom has to be redone inside ten years.

Membrane goes on to the current Australian standard, over a floor set to drain, with the wet area extents and the junctions detailed rather than painted over. It cures before anyone tiles. You get the certificate. The waterproofing and tiling page goes through the detail.

While the walls are open is also the only sensible time to deal with lighting and ventilation. An exhaust fan ducted to outside — not into the roof space, which is how most houses of this age were built — and a lighting layout that suits the zones around the bath and shower. Our guide to bathroom lighting and IP zones explains what rating belongs where, and all electrical work is done by a licensed electrician.

Asbestos, stated plainly

Houses built or altered before about 1990 can contain asbestos. In a bathroom the usual candidates are fibre cement sheeting behind the wall tiles, the ceiling sheet, and some older vinyl and adhesive on the floor. It is not a reason to abandon a renovation and it is not an emergency.

What it means in practice: a sample is tested before demolition, and if it comes back positive the removal is carried out by a separately licensed asbestos removalist and priced on its own line so you can see what it costs. We never cut into unknown sheeting to save a day.

Finishes that survive a full household

  • Porcelain floor tiles with an appropriate slip classification, because a wet floor with three generations using it is a genuine hazard. See the slip ratings guide.
  • Full-height wall tiling in the shower, and preferably to the ceiling throughout, so there is less painted surface to go mouldy.
  • A vanity with drawers rather than cupboard doors. Drawers hold more and you can see what is in them.
  • Mainstream tapware with parts you can still buy in ten years. Imported designer sets look superb and become unserviceable.
  • No engineered stone. It has been banned in Australia since 1 July 2024 and we do not offer it. Compact laminate, porcelain slab, solid surface and natural stone all do the same job.

What it costs and what happens next

Rough bands are on the price guide, the week-by-week sequence is on how the job runs, and everything else people ask is on the questions page.

Most homes around here went up before 1990, so the strip-out is the moment asbestos matters. Our guide on what asbestos looks like in an older bathroom explains where it hides and why only a lab test settles it.

The next step is a free measure. Half an hour, at your place, including evenings and Saturdays. You get a written fixed price with the fittings named and the tile allowance stated, and no follow-up sales calls.

Renovation work is carried out in partnership with Coastal Renovation Group, a licensed NSW builder. Licence and insurance details are provided on request.

Also on these streets

The suburbs this job comes from most

  1. Yagoona
  2. Bass Hill
  3. Chester Hill
  4. Condell Park
  5. Panania
  6. Milperra
FAQs

Questions people ask before they commit

How long are we without the bathroom?

Plan on about three to four weeks of site work once the materials are on site. Roughly a week of that is waiting rather than working, because the waterproofing membrane has to cure before tiling can start and nobody should rush it. If it is the only bathroom in the house, we set the dates with you before demolition so you can arrange showers.

Can you take out the wall to the separate toilet?

Usually. In a post-war brick-veneer or full-brick house that dividing wall is rarely load bearing, and removing it is the change that transforms the room. We confirm it on site, because a few houses carry a roof load through there and then it needs a lintel, which is a cost rather than a stopper.

Do you have to move the plumbing?

Only if the new layout needs it. Keeping the bath, shower, basin and toilet roughly where they are is the biggest single saving available on a full renovation. Moving a waste through a concrete slab means cutting and re-pouring the floor, which adds days and cost, so we show you both options at quote stage.

What happens if you find water damage behind the tiles?

It is common in rooms of this age and we expect it. Soft floor sheeting, rusted bath feet and rotted wall framing next to a leaking shower all get repaired before the new room goes in. Because it cannot be seen before demolition, the quote states how repairs like that are priced rather than pretending the risk is not there.

Can we re-use the existing bath?

If it is a sound pressed-steel bath and you want to keep it, yes. It is lifted out, the chips are assessed, and it goes back on a new base. Plenty of households instead give the space to a larger shower, which suits a house with teenagers more than a house with toddlers.

Free, no-obligation

Get your free quote today

Book a Free Measure

Bankstown Bathrooms Call 02 4404 0504 Free measure & quote
Call 02 4404 0504